ZIP code × permit type
Signs permits in ZIP 60639
The median signs permit wait in ZIP 60639 was 16 days, based on 274 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Signs permits in ZIP 60639, 274 issued permit records show a median processing time of 16 days; 75% were issued within 49 days and 90% within 100 days, covering January 2021 through September 15, 2026.
The median was 4.5 days slower than the previous 12 months.
Signs permits in ZIP 60639: wait distribution
For Signs permits in ZIP 60639, 274 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Signs permits in ZIP 60639: annual permit timing
Signs permits in ZIP 60639 has 6 publishable issue-year cohorts spanning 2021–2026, representing 274 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 40 | 29 days | 103 days | 159 days |
| 2022 | 55 | 6 days | 38 days | 167 days |
| 2023 | 71 | 1 day | 7.5 days | 48 days |
| 2024 | 22 | 57 days | 88 days | 100 days |
| 2025 | 66 | 27 days | 43 days | 68 days |
| 2026* | 20 | 38 days | 49 days | 81 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Signs permits in ZIP 60639: Signs timing in comparable ZIP codes
Signs permits in ZIP 60639 has 274 issued records, a 16 days median, and a 49 days 75th-percentile wait in this release.
More Signs permits in ZIP 60639 comparisons
The Signs permits in ZIP 60639 cohort contains 274 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60639 permits ZIP reportSigns citywide Type report