Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP boundary report

Permit processing times in ZIP 60639

Across 3,084 issued permits assigned to ZIP 60639, the median processing time was 1 day.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked3,0842021–Sep. 15, 2026

The short answer

For Permit processing times in ZIP 60639, 3,084 issued permit records show a median processing time of 1 day; 75% were issued within 14 days and 90% within 71 days, covering January 2021 through September 15, 2026.

Typical wait1 daymedian issued permit
Usually within14 days75% of records
Long-wait edge71 days90% of records
Evidence3,084issued permits

The median was 1 day faster than the previous 12 months.

Permit processing times in ZIP 60639: wait distribution

For Permit processing times in ZIP 60639, 3,084 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
47.7%
1–7 days
19.9%
8–30 days
14.7%
31–90 days
9.9%
91+ days
7.7%

Change over time

Permit processing times in ZIP 60639: annual permit timing

Permit processing times in ZIP 60639 has 6 publishable issue-year cohorts spanning 2021–2026, representing 3,084 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
20216430 days8 days53 days
20225900 days6 days57 days
20235640 days12 days74 days
20245104 days21 days77 days
20254826 days29 days77 days
2026*2954 days30 days79 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Permit processing times in ZIP 60639: ZIP codes with similar overall timing

Permit processing times in ZIP 60639 has 3,084 issued records, a 1 day median, and a 14 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
606021 day10 days1,991
606031 day13 days1,858
606051 day16 days2,380
606091 day21 days3,840
606121 day25 days3,771
606171 day11 days4,812
606191 day12 days5,016
606201 day11 days5,084