Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

Signs permits in ZIP 60631

The median signs permit wait in ZIP 60631 was 11 days, based on 125 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked1252021–Sep. 15, 2026

The short answer

For Signs permits in ZIP 60631, 125 issued permit records show a median processing time of 11 days; 75% were issued within 26 days and 90% within 48 days, covering January 2021 through September 15, 2026.

Typical wait11 daysmedian issued permit
Usually within26 days75% of records
Long-wait edge48 days90% of records
Evidence125issued permits

Not enough records for a year-over-year comparison.

Signs permits in ZIP 60631: wait distribution

For Signs permits in ZIP 60631, 125 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
3.2%
1–7 days
43.2%
8–30 days
38.4%
31–90 days
13.6%
91+ days
1.6%

Change over time

Signs permits in ZIP 60631: annual permit timing

Signs permits in ZIP 60631 has 4 publishable issue-year cohorts spanning 2021–2024, representing 112 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
2021127.5 days28 days57 days
2022344 days4 days6 days
20234311 days15 days26 days
20242328 days38 days56 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Signs permits in ZIP 60631: Signs timing in comparable ZIP codes

Signs permits in ZIP 60631 has 125 issued records, a 11 days median, and a 26 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6063111 days26 days125
ZIP 6064611 days63 days95
ZIP 6061713 days42 days206
ZIP 6063613 days35 days99
ZIP 6063813 days20 days232
ZIP 6061214 days50 days238
ZIP 6062014 days37 days235
ZIP 6063214 days35 days433