Signs permits in ZIP 60646

The median signs permit wait in ZIP 60646 was 11 days, based on 95 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked952021–Sep. 15, 2026

The short answer

For Signs permits in ZIP 60646, 95 issued permit records show a median processing time of 11 days; 75% were issued within 63 days and 90% within 174 days, covering January 2021 through September 15, 2026.

Typical wait11 daysmedian issued permit
Usually within63 days75% of records
Long-wait edge174 days90% of records
Evidence95issued permits

Not enough records for a year-over-year comparison.

Signs permits in ZIP 60646: wait distribution

For Signs permits in ZIP 60646, 95 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
0.0%
1–7 days
40.0%
8–30 days
24.2%
31–90 days
11.6%
91+ days
24.2%

Change over time

Signs permits in ZIP 60646: annual permit timing

Signs permits in ZIP 60646 has 4 publishable issue-year cohorts spanning 2021–2026, representing 81 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
2021398 days54 days220 days
2023141 day1.8 days221 days
20251420 days41 days86 days
2026*14174 days174 days174 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Signs permits in ZIP 60646: Signs timing in comparable ZIP codes

Signs permits in ZIP 60646 has 95 issued records, a 11 days median, and a 63 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6063111 days26 days125
ZIP 6064611 days63 days95
ZIP 6061713 days42 days206
ZIP 6063613 days35 days99
ZIP 6063813 days20 days232
ZIP 6061214 days50 days238
ZIP 6062014 days37 days235
ZIP 6063214 days35 days433