ZIP code × permit type
Reinstated Permit permits in ZIP 60636
The median reinstated permit permit wait in ZIP 60636 was 0 days, based on 38 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Reinstated Permit permits in ZIP 60636, 38 issued permit records show a median processing time of 0 days; 75% were issued within 0 days and 90% within 0 days, covering January 2021 through September 15, 2026.
Not enough records for a year-over-year comparison.
Reinstated Permit permits in ZIP 60636: wait distribution
For Reinstated Permit permits in ZIP 60636, 38 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Reinstated Permit permits in ZIP 60636: annual permit timing
Reinstated Permit permits in ZIP 60636 has 1 publishable issue-year cohorts spanning 2026–2026, representing 14 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2026* | 14 | 0 days | 0 days | 0 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Reinstated Permit permits in ZIP 60636: Reinstated Permit timing in comparable ZIP codes
Reinstated Permit permits in ZIP 60636 has 38 issued records, a 0 days median, and a 0 days 75th-percentile wait in this release.
More Reinstated Permit permits in ZIP 60636 comparisons
The Reinstated Permit permits in ZIP 60636 cohort contains 38 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60636 permits ZIP reportReinstated Permit citywide Type report