ZIP code × permit type
Reinstated Permit permits in ZIP 60608
The median reinstated permit permit wait in ZIP 60608 was 0 days, based on 57 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Reinstated Permit permits in ZIP 60608, 57 issued permit records show a median processing time of 0 days; 75% were issued within 0 days and 90% within 1.4 days, covering January 2021 through September 15, 2026.
Not enough records for a year-over-year comparison.
Reinstated Permit permits in ZIP 60608: wait distribution
For Reinstated Permit permits in ZIP 60608, 57 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Reinstated Permit permits in ZIP 60608: annual permit timing
Reinstated Permit permits in ZIP 60608 has 2 publishable issue-year cohorts spanning 2021–2025, representing 32 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 11 | 0 days | 0 days | 1 day |
| 2025 | 21 | 0 days | 0 days | 0 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Reinstated Permit permits in ZIP 60608: Reinstated Permit timing in comparable ZIP codes
Reinstated Permit permits in ZIP 60608 has 57 issued records, a 0 days median, and a 0 days 75th-percentile wait in this release.
More Reinstated Permit permits in ZIP 60608 comparisons
The Reinstated Permit permits in ZIP 60608 cohort contains 57 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60608 permits ZIP reportReinstated Permit citywide Type report