ZIP code × permit type
Wrecking & Demolition permits in ZIP 60636
The median wrecking & demolition permit wait in ZIP 60636 was 0 days, based on 192 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Wrecking & Demolition permits in ZIP 60636, 192 issued permit records show a median processing time of 0 days; 75% were issued within 53 days and 90% within 175 days, covering January 2021 through September 15, 2026.
The median was unchanged from the previous 12 months.
Wrecking & Demolition permits in ZIP 60636: wait distribution
For Wrecking & Demolition permits in ZIP 60636, 192 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Wrecking & Demolition permits in ZIP 60636: annual permit timing
Wrecking & Demolition permits in ZIP 60636 has 6 publishable issue-year cohorts spanning 2021–2026, representing 192 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 43 | 64 days | 174 days | 207 days |
| 2022 | 39 | 0 days | 6.5 days | 264 days |
| 2023 | 35 | 0 days | 0 days | 0 days |
| 2024 | 29 | 0 days | 0 days | 7.4 days |
| 2025 | 23 | 0 days | 0 days | 0 days |
| 2026* | 23 | 41 days | 56 days | 100 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Wrecking & Demolition permits in ZIP 60636: Wrecking & Demolition timing in comparable ZIP codes
Wrecking & Demolition permits in ZIP 60636 has 192 issued records, a 0 days median, and a 53 days 75th-percentile wait in this release.
More Wrecking & Demolition permits in ZIP 60636 comparisons
The Wrecking & Demolition permits in ZIP 60636 cohort contains 192 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60636 permits ZIP reportWrecking & Demolition citywide Type report