Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP boundary report

Permit processing times in ZIP 60626

Across 1,817 issued permits assigned to ZIP 60626, the median processing time was 2 days.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked1,8172021–Sep. 15, 2026

The short answer

For Permit processing times in ZIP 60626, 1,817 issued permit records show a median processing time of 2 days; 75% were issued within 15 days and 90% within 66 days, covering January 2021 through September 15, 2026.

Typical wait2 daysmedian issued permit
Usually within15 days75% of records
Long-wait edge66 days90% of records
Evidence1,817issued permits

The median was unchanged from the previous 12 months.

Permit processing times in ZIP 60626: wait distribution

For Permit processing times in ZIP 60626, 1,817 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
41.9%
1–7 days
22.2%
8–30 days
18.2%
31–90 days
10.3%
91+ days
7.4%

Change over time

Permit processing times in ZIP 60626: annual permit timing

Permit processing times in ZIP 60626 has 6 publishable issue-year cohorts spanning 2021–2026, representing 1,817 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
20213100 days6.8 days43 days
20223340 days6 days44 days
20233071 day13 days65 days
20243397 days30 days87 days
20253126 days21 days69 days
2026*2156 days25 days110 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Permit processing times in ZIP 60626: ZIP codes with similar overall timing

Permit processing times in ZIP 60626 has 1,817 issued records, a 2 days median, and a 15 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
606062 days15 days6,775
606082 days26 days4,677
606132 days21 days2,994
606162 days25 days2,939
606182 days27 days6,576
606212 days23 days2,516
606232 days24 days4,182
606242 days21 days2,944