Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

Elevator Equipment permits in ZIP 60626

The median elevator equipment permit wait in ZIP 60626 was 0 days, based on 87 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked872021–Sep. 15, 2026

The short answer

For Elevator Equipment permits in ZIP 60626, 87 issued permit records show a median processing time of 0 days; 75% were issued within 2 days and 90% within 5.8 days, covering January 2021 through September 15, 2026.

Typical wait0 daysmedian issued permit
Usually within2 days75% of records
Long-wait edge5.8 days90% of records
Evidence87issued permits

Not enough records for a year-over-year comparison.

Elevator Equipment permits in ZIP 60626: wait distribution

For Elevator Equipment permits in ZIP 60626, 87 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
71.3%
1–7 days
24.1%
8–30 days
3.4%
31–90 days
1.1%
91+ days
0.0%

Change over time

Elevator Equipment permits in ZIP 60626: annual permit timing

Elevator Equipment permits in ZIP 60626 has 5 publishable issue-year cohorts spanning 2021–2025, representing 80 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
2021210 days0 days0 days
2022130 days0 days0 days
2023160 days0.2 days5 days
2024130 days0 days4.4 days
2025175 days7 days12 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Elevator Equipment permits in ZIP 60626: Elevator Equipment timing in comparable ZIP codes

Elevator Equipment permits in ZIP 60626 has 87 issued records, a 0 days median, and a 2 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 606010 days5 days290
ZIP 606020 days5 days113
ZIP 606030 days5 days147
ZIP 606040 days0 days90
ZIP 606050 days4 days187
ZIP 606060 days5 days240
ZIP 606070 days1 day240
ZIP 606080 days0 days146