ZIP code × permit type
New Construction permits in ZIP 60626
The median new construction permit wait in ZIP 60626 was 18 days, based on 34 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For New Construction permits in ZIP 60626, 34 issued permit records show a median processing time of 18 days; 75% were issued within 127 days and 90% within 195 days, covering January 2021 through September 15, 2026.
Not enough records for a year-over-year comparison.
New Construction permits in ZIP 60626: wait distribution
For New Construction permits in ZIP 60626, 34 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
New Construction permits in ZIP 60626: annual permit timing
New Construction permits in ZIP 60626 has 1 publishable issue-year cohorts spanning 2026–2026, representing 11 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2026* | 11 | 29 days | 169 days | 198 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
New Construction permits in ZIP 60626: New Construction timing in comparable ZIP codes
New Construction permits in ZIP 60626 has 34 issued records, a 18 days median, and a 127 days 75th-percentile wait in this release.
More New Construction permits in ZIP 60626 comparisons
The New Construction permits in ZIP 60626 cohort contains 34 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60626 permits ZIP reportNew Construction citywide Type report