ZIP code × permit type
New Construction permits in ZIP 60637
The median new construction permit wait in ZIP 60637 was 19 days, based on 397 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For New Construction permits in ZIP 60637, 397 issued permit records show a median processing time of 19 days; 75% were issued within 75 days and 90% within 145 days, covering January 2021 through September 15, 2026.
The median was 12 days faster than the previous 12 months.
New Construction permits in ZIP 60637: wait distribution
For New Construction permits in ZIP 60637, 397 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
New Construction permits in ZIP 60637: annual permit timing
New Construction permits in ZIP 60637 has 6 publishable issue-year cohorts spanning 2021–2026, representing 397 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 83 | 8 days | 42 days | 178 days |
| 2022 | 73 | 0 days | 34 days | 113 days |
| 2023 | 65 | 9 days | 64 days | 177 days |
| 2024 | 58 | 29 days | 72 days | 126 days |
| 2025 | 67 | 74 days | 120 days | 256 days |
| 2026* | 51 | 42 days | 68 days | 118 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
New Construction permits in ZIP 60637: New Construction timing in comparable ZIP codes
New Construction permits in ZIP 60637 has 397 issued records, a 19 days median, and a 75 days 75th-percentile wait in this release.
More New Construction permits in ZIP 60637 comparisons
The New Construction permits in ZIP 60637 cohort contains 397 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60637 permits ZIP reportNew Construction citywide Type report