ZIP code × permit type
New Construction permits in ZIP 60661
The median new construction permit wait in ZIP 60661 was 21 days, based on 41 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For New Construction permits in ZIP 60661, 41 issued permit records show a median processing time of 21 days; 75% were issued within 51 days and 90% within 124 days, covering January 2021 through September 15, 2026.
Not enough records for a year-over-year comparison.
New Construction permits in ZIP 60661: wait distribution
For New Construction permits in ZIP 60661, 41 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
New Construction permits in ZIP 60661: annual permit timing
New Construction permits in ZIP 60661 has 2 publishable issue-year cohorts spanning 2021–2022, representing 24 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 14 | 30 days | 72 days | 89 days |
| 2022 | 10 | 18 days | 38 days | 93 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
New Construction permits in ZIP 60661: New Construction timing in comparable ZIP codes
New Construction permits in ZIP 60661 has 41 issued records, a 21 days median, and a 51 days 75th-percentile wait in this release.
More New Construction permits in ZIP 60661 comparisons
The New Construction permits in ZIP 60661 cohort contains 41 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60661 permits ZIP reportNew Construction citywide Type report