ZIP code × permit type
Renovation & Alteration permits in ZIP 60644
The median renovation & alteration permit wait in ZIP 60644 was 33 days, based on 605 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Renovation & Alteration permits in ZIP 60644, 605 issued permit records show a median processing time of 33 days; 75% were issued within 91 days and 90% within 192 days, covering January 2021 through September 15, 2026.
The median was 18 days slower than the previous 12 months.
Renovation & Alteration permits in ZIP 60644: wait distribution
For Renovation & Alteration permits in ZIP 60644, 605 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Renovation & Alteration permits in ZIP 60644: annual permit timing
Renovation & Alteration permits in ZIP 60644 has 6 publishable issue-year cohorts spanning 2021–2026, representing 605 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 122 | 26 days | 78 days | 216 days |
| 2022 | 142 | 7 days | 59 days | 123 days |
| 2023 | 102 | 18 days | 82 days | 231 days |
| 2024 | 109 | 37 days | 91 days | 173 days |
| 2025 | 73 | 67 days | 129 days | 281 days |
| 2026* | 57 | 60 days | 106 days | 181 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Renovation & Alteration permits in ZIP 60644: Renovation & Alteration timing in comparable ZIP codes
Renovation & Alteration permits in ZIP 60644 has 605 issued records, a 33 days median, and a 91 days 75th-percentile wait in this release.
More Renovation & Alteration permits in ZIP 60644 comparisons
The Renovation & Alteration permits in ZIP 60644 cohort contains 605 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60644 permits ZIP reportRenovation & Alteration citywide Type report