ZIP code × permit type
Renovation & Alteration permits in ZIP 60615
The median renovation & alteration permit wait in ZIP 60615 was 32 days, based on 588 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Renovation & Alteration permits in ZIP 60615, 588 issued permit records show a median processing time of 32 days; 75% were issued within 90 days and 90% within 158 days, covering January 2021 through September 15, 2026.
The median was 1.5 days faster than the previous 12 months.
Renovation & Alteration permits in ZIP 60615: wait distribution
For Renovation & Alteration permits in ZIP 60615, 588 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Renovation & Alteration permits in ZIP 60615: annual permit timing
Renovation & Alteration permits in ZIP 60615 has 6 publishable issue-year cohorts spanning 2021–2026, representing 588 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 105 | 2 days | 43 days | 82 days |
| 2022 | 112 | 3.5 days | 54 days | 113 days |
| 2023 | 119 | 43 days | 98 days | 184 days |
| 2024 | 103 | 50 days | 95 days | 210 days |
| 2025 | 93 | 56 days | 114 days | 169 days |
| 2026* | 56 | 58 days | 126 days | 192 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Renovation & Alteration permits in ZIP 60615: Renovation & Alteration timing in comparable ZIP codes
Renovation & Alteration permits in ZIP 60615 has 588 issued records, a 32 days median, and a 90 days 75th-percentile wait in this release.
More Renovation & Alteration permits in ZIP 60615 comparisons
The Renovation & Alteration permits in ZIP 60615 cohort contains 588 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60615 permits ZIP reportRenovation & Alteration citywide Type report