Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP boundary report

Permit processing times in ZIP 60622

Across 4,440 issued permits assigned to ZIP 60622, the median processing time was 4 days.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked4,4402021–Sep. 15, 2026

The short answer

For Permit processing times in ZIP 60622, 4,440 issued permit records show a median processing time of 4 days; 75% were issued within 31 days and 90% within 101 days, covering January 2021 through September 15, 2026.

Typical wait4 daysmedian issued permit
Usually within31 days75% of records
Long-wait edge101 days90% of records
Evidence4,440issued permits

The median was 0.5 days faster than the previous 12 months.

Permit processing times in ZIP 60622: wait distribution

For Permit processing times in ZIP 60622, 4,440 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
36.6%
1–7 days
21.0%
8–30 days
17.0%
31–90 days
13.8%
91+ days
11.5%

Change over time

Permit processing times in ZIP 60622: annual permit timing

Permit processing times in ZIP 60622 has 6 publishable issue-year cohorts spanning 2021–2026, representing 4,440 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
20218970 days13 days73 days
20229081 day13 days89 days
20237431 day23 days89 days
202467314 days43 days127 days
202571212 days47 days132 days
2026*50711 days56 days122 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Permit processing times in ZIP 60622: ZIP codes with similar overall timing

Permit processing times in ZIP 60622 has 4,440 issued records, a 4 days median, and a 31 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
606074 days28 days4,911
606104 days25 days3,503
606114 days15 days7,470
606224 days31 days4,440
606534 days29 days2,085
606544 days27 days3,185
606013 days15 days3,363
606043 days17 days1,054