ZIP code × permit type

Renovation & Alteration permits in ZIP 60655

The median renovation & alteration permit wait in ZIP 60655 was 42 days, based on 250 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked2502021–Sep. 15, 2026

The short answer

For Renovation & Alteration permits in ZIP 60655, 250 issued permit records show a median processing time of 42 days; 75% were issued within 85 days and 90% within 167 days, covering January 2021 through September 15, 2026.

Typical wait42 daysmedian issued permit
Usually within85 days75% of records
Long-wait edge167 days90% of records
Evidence250issued permits

The median was 7 days faster than the previous 12 months.

Renovation & Alteration permits in ZIP 60655: wait distribution

For Renovation & Alteration permits in ZIP 60655, 250 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
14.0%
1–7 days
5.6%
8–30 days
19.2%
31–90 days
37.6%
91+ days
23.6%

Change over time

Renovation & Alteration permits in ZIP 60655: annual permit timing

Renovation & Alteration permits in ZIP 60655 has 6 publishable issue-year cohorts spanning 2021–2026, representing 250 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
20215618 days60 days123 days
20225523 days44 days88 days
20234946 days78 days129 days
20242442 days83 days175 days
20253480 days108 days167 days
2026*3278 days120 days251 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Renovation & Alteration permits in ZIP 60655: Renovation & Alteration timing in comparable ZIP codes

Renovation & Alteration permits in ZIP 60655 has 250 issued records, a 42 days median, and a 85 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6060842 days115 days1,029
ZIP 6062242 days100 days1,099
ZIP 6065542 days85 days250
ZIP 6062841 days103 days645
ZIP 6062941 days110 days571
ZIP 6063041 days94 days563
ZIP 6063443 days109 days457
ZIP 6064343 days108 days556