ZIP boundary report
Permit processing times in ZIP 60655
Across 1,484 issued permits assigned to ZIP 60655, the median processing time was 1 day.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Permit processing times in ZIP 60655, 1,484 issued permit records show a median processing time of 1 day; 75% were issued within 15 days and 90% within 61 days, covering January 2021 through September 15, 2026.
The median was 4.5 days slower than the previous 12 months.
Permit processing times in ZIP 60655: wait distribution
For Permit processing times in ZIP 60655, 1,484 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Permit processing times in ZIP 60655: annual permit timing
Permit processing times in ZIP 60655 has 6 publishable issue-year cohorts spanning 2021–2026, representing 1,484 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 287 | 0 days | 8.5 days | 49 days |
| 2022 | 259 | 0 days | 11 days | 45 days |
| 2023 | 273 | 0 days | 13 days | 78 days |
| 2024 | 248 | 2 days | 19 days | 42 days |
| 2025 | 235 | 2 days | 21 days | 71 days |
| 2026* | 182 | 6 days | 31 days | 78 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Permit processing times in ZIP 60655: ZIP codes with similar overall timing
Permit processing times in ZIP 60655 has 1,484 issued records, a 1 day median, and a 15 days 75th-percentile wait in this release.
More Permit processing times in ZIP 60655 comparisons
The Permit processing times in ZIP 60655 cohort contains 1,484 issued records; related links retain separate location and permit-category cohorts.
Express Permit Program 1 dayEasy Permit Process 0 daysRenovation & Alteration 42 daysSigns 21 daysNew Construction 52 days