New Construction permits in ZIP 60643

The median new construction permit wait in ZIP 60643 was 91 days, based on 68 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked682021–Sep. 15, 2026

The short answer

For New Construction permits in ZIP 60643, 68 issued permit records show a median processing time of 91 days; 75% were issued within 160 days and 90% within 236 days, covering January 2021 through September 15, 2026.

Typical wait91 daysmedian issued permit
Usually within160 days75% of records
Long-wait edge236 days90% of records
Evidence68issued permits

Not enough records for a year-over-year comparison.

New Construction permits in ZIP 60643: wait distribution

For New Construction permits in ZIP 60643, 68 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
20.6%
1–7 days
7.4%
8–30 days
2.9%
31–90 days
16.2%
91+ days
52.9%

Change over time

New Construction permits in ZIP 60643: annual permit timing

New Construction permits in ZIP 60643 has 2 publishable issue-year cohorts spanning 2025–2026, representing 36 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
20251898 days173 days275 days
2026*1891 days147 days175 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

New Construction permits in ZIP 60643: New Construction timing in comparable ZIP codes

New Construction permits in ZIP 60643 has 68 issued records, a 91 days median, and a 160 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6064391 days160 days68
ZIP 6061778 days212 days44
ZIP 6063472 days170 days60
ZIP 6065972 days138 days40
ZIP 6064471 days140 days91
ZIP 6066062 days101 days81
ZIP 6065157 days114 days151
ZIP 6060956 days161 days228