New Construction permits in ZIP 60617
The median new construction permit wait in ZIP 60617 was 78 days, based on 44 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For New Construction permits in ZIP 60617, 44 issued permit records show a median processing time of 78 days; 75% were issued within 212 days and 90% within 296 days, covering January 2021 through September 15, 2026.
Not enough records for a year-over-year comparison.
New Construction permits in ZIP 60617: wait distribution
For New Construction permits in ZIP 60617, 44 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
New Construction permits in ZIP 60617: annual permit timing
New Construction permits in ZIP 60617 has 1 publishable issue-year cohorts spanning 2021–2021, representing 10 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 10 | 22 days | 84 days | 183 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
New Construction permits in ZIP 60617: New Construction timing in comparable ZIP codes
New Construction permits in ZIP 60617 has 44 issued records, a 78 days median, and a 212 days 75th-percentile wait in this release.
More New Construction permits in ZIP 60617 comparisons
The New Construction permits in ZIP 60617 cohort contains 44 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60617 permits ZIP reportNew Construction citywide Type report