The median new construction permit wait in ZIP 60651 was 57 days, based on 151 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For New Construction permits in ZIP 60651, 151 issued permit records show a median processing time of 57 days; 75% were issued within 114 days and 90% within 238 days, covering January 2021 through September 15, 2026.
Not enough records for a year-over-year comparison.
New Construction permits in ZIP 60651: wait distribution
For New Construction permits in ZIP 60651, 151 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
New Construction permits in ZIP 60651: annual permit timing
New Construction permits in ZIP 60651 has 6 publishable issue-year cohorts spanning 2021–2026, representing 151 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 42 | 29 days | 66 days | 126 days |
| 2022 | 20 | 22 days | 107 days | 396 days |
| 2023 | 21 | 89 days | 168 days | 327 days |
| 2024 | 20 | 48 days | 115 days | 190 days |
| 2025 | 35 | 66 days | 113 days | 224 days |
| 2026* | 13 | 113 days | 190 days | 278 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
New Construction permits in ZIP 60651: New Construction timing in comparable ZIP codes
New Construction permits in ZIP 60651 has 151 issued records, a 57 days median, and a 114 days 75th-percentile wait in this release.
More New Construction permits in ZIP 60651 comparisons
The New Construction permits in ZIP 60651 cohort contains 151 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60651 permits ZIP reportNew Construction citywide Type report