ZIP code × permit type
New Construction permits in ZIP 60611
The median new construction permit wait in ZIP 60611 was 5 days, based on 124 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For New Construction permits in ZIP 60611, 124 issued permit records show a median processing time of 5 days; 75% were issued within 28 days and 90% within 109 days, covering January 2021 through September 15, 2026.
The median was 22 days faster than the previous 12 months.
New Construction permits in ZIP 60611: wait distribution
For New Construction permits in ZIP 60611, 124 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
New Construction permits in ZIP 60611: annual permit timing
New Construction permits in ZIP 60611 has 6 publishable issue-year cohorts spanning 2021–2026, representing 124 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 12 | 0 days | 9.5 days | 44 days |
| 2022 | 18 | 0 days | 18 days | 102 days |
| 2023 | 21 | 1 day | 39 days | 51 days |
| 2024 | 28 | 7 days | 100 days | 159 days |
| 2025 | 26 | 17 days | 31 days | 70 days |
| 2026* | 19 | 2 days | 4.5 days | 18 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
New Construction permits in ZIP 60611: New Construction timing in comparable ZIP codes
New Construction permits in ZIP 60611 has 124 issued records, a 5 days median, and a 28 days 75th-percentile wait in this release.
More New Construction permits in ZIP 60611 comparisons
The New Construction permits in ZIP 60611 cohort contains 124 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60611 permits ZIP reportNew Construction citywide Type report