New Construction permits in ZIP 60606

The median new construction permit wait in ZIP 60606 was 1 day, based on 25 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked252021–Sep. 15, 2026

The short answer

For New Construction permits in ZIP 60606, 25 issued permit records show a median processing time of 1 day; 75% were issued within 6 days and 90% within 29 days, covering January 2021 through September 15, 2026.

Typical wait1 daymedian issued permit
Usually within6 days75% of records
Long-wait edge29 days90% of records
Evidence25issued permits

Not enough records for a year-over-year comparison.

New Construction permits in ZIP 60606: wait distribution

For New Construction permits in ZIP 60606, 25 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
48.0%
1–7 days
28.0%
8–30 days
12.0%
31–90 days
4.0%
91+ days
8.0%

Change over time

New Construction permits in ZIP 60606: annual permit timing

New Construction permits in ZIP 60606 has 0 publishable issue-year cohorts spanning no qualifying years, representing 0 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

New Construction permits in ZIP 60606: New Construction timing in comparable ZIP codes

New Construction permits in ZIP 60606 has 25 issued records, a 1 day median, and a 6 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 606021 day5 days397
ZIP 606051 day10 days287
ZIP 606061 day6 days25
ZIP 606491 day7 days45
ZIP 606030 days1.8 days28
ZIP 606115 days28 days124
ZIP 606106 days42 days126
ZIP 606139 days67 days232