ZIP boundary report
Permit processing times in ZIP 60633
Across 950 issued permits assigned to ZIP 60633, the median processing time was 0 days.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Permit processing times in ZIP 60633, 950 issued permit records show a median processing time of 0 days; 75% were issued within 4 days and 90% within 17 days, covering January 2021 through September 15, 2026.
The median was unchanged from the previous 12 months.
Permit processing times in ZIP 60633: wait distribution
For Permit processing times in ZIP 60633, 950 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Permit processing times in ZIP 60633: annual permit timing
Permit processing times in ZIP 60633 has 6 publishable issue-year cohorts spanning 2021–2026, representing 950 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 215 | 0 days | 0 days | 13 days |
| 2022 | 225 | 0 days | 0 days | 13 days |
| 2023 | 152 | 0 days | 5.5 days | 45 days |
| 2024 | 146 | 0 days | 2.8 days | 20 days |
| 2025 | 129 | 2 days | 8 days | 19 days |
| 2026* | 83 | 2 days | 6 days | 16 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Permit processing times in ZIP 60633: ZIP codes with similar overall timing
Permit processing times in ZIP 60633 has 950 issued records, a 0 days median, and a 4 days 75th-percentile wait in this release.
More Permit processing times in ZIP 60633 comparisons
The Permit processing times in ZIP 60633 cohort contains 950 issued records; related links retain separate location and permit-category cohorts.
Express Permit Program 0 daysEasy Permit Process 0 daysRenovation & Alteration 38 days