ZIP boundary report
Permit processing times in ZIP 60666
Across 397 issued permits assigned to ZIP 60666, the median processing time was 0 days.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Permit processing times in ZIP 60666, 397 issued permit records show a median processing time of 0 days; 75% were issued within 4 days and 90% within 26 days, covering January 2021 through September 15, 2026.
The median was 1 day faster than the previous 12 months.
Permit processing times in ZIP 60666: wait distribution
For Permit processing times in ZIP 60666, 397 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Permit processing times in ZIP 60666: annual permit timing
Permit processing times in ZIP 60666 has 6 publishable issue-year cohorts spanning 2021–2026, representing 397 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 39 | 0 days | 8.5 days | 40 days |
| 2022 | 38 | 0 days | 0 days | 4.2 days |
| 2023 | 68 | 0 days | 12 days | 39 days |
| 2024 | 59 | 1 day | 12 days | 37 days |
| 2025 | 99 | 0 days | 4 days | 17 days |
| 2026* | 94 | 0 days | 1 day | 7.7 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Permit processing times in ZIP 60666: ZIP codes with similar overall timing
Permit processing times in ZIP 60666 has 397 issued records, a 0 days median, and a 4 days 75th-percentile wait in this release.
More Permit processing times in ZIP 60666 comparisons
The Permit processing times in ZIP 60666 cohort contains 397 issued records; related links retain separate location and permit-category cohorts.
Express Permit Program 0 daysRenovation & Alteration 13 days