Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

Wrecking & Demolition permits in ZIP 60657

The median wrecking & demolition permit wait in ZIP 60657 was 0 days, based on 226 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked2262021–Sep. 15, 2026

The short answer

For Wrecking & Demolition permits in ZIP 60657, 226 issued permit records show a median processing time of 0 days; 75% were issued within 39 days and 90% within 104 days, covering January 2021 through September 15, 2026.

Typical wait0 daysmedian issued permit
Usually within39 days75% of records
Long-wait edge104 days90% of records
Evidence226issued permits

The median was 36 days slower than the previous 12 months.

Wrecking & Demolition permits in ZIP 60657: wait distribution

For Wrecking & Demolition permits in ZIP 60657, 226 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
68.6%
1–7 days
1.8%
8–30 days
2.2%
31–90 days
15.9%
91+ days
11.5%

Change over time

Wrecking & Demolition permits in ZIP 60657: annual permit timing

Wrecking & Demolition permits in ZIP 60657 has 6 publishable issue-year cohorts spanning 2021–2026, representing 226 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
20214148 days69 days115 days
2022440 days0.2 days131 days
2023340 days0 days0.7 days
2024470 days0 days0 days
2025310 days0 days0 days
2026*2968 days104 days121 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Wrecking & Demolition permits in ZIP 60657: Wrecking & Demolition timing in comparable ZIP codes

Wrecking & Demolition permits in ZIP 60657 has 226 issued records, a 0 days median, and a 39 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 606070 days70 days89
ZIP 606080 days64 days115
ZIP 606090 days48 days151
ZIP 606120 days58 days95
ZIP 606130 days51 days128
ZIP 606140 days60 days270
ZIP 606160 days55 days53
ZIP 606170 days24 days118