Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

New Construction permits in ZIP 60645

The median new construction permit wait in ZIP 60645 was 50 days, based on 40 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked402021–Sep. 15, 2026

The short answer

For New Construction permits in ZIP 60645, 40 issued permit records show a median processing time of 50 days; 75% were issued within 193 days and 90% within 325 days, covering January 2021 through September 15, 2026.

Typical wait50 daysmedian issued permit
Usually within193 days75% of records
Long-wait edge325 days90% of records
Evidence40issued permits

Not enough records for a year-over-year comparison.

New Construction permits in ZIP 60645: wait distribution

For New Construction permits in ZIP 60645, 40 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
30.0%
1–7 days
2.5%
8–30 days
12.5%
31–90 days
12.5%
91+ days
42.5%

Change over time

New Construction permits in ZIP 60645: annual permit timing

New Construction permits in ZIP 60645 has 0 publishable issue-year cohorts spanning no qualifying years, representing 0 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

New Construction permits in ZIP 60645: New Construction timing in comparable ZIP codes

New Construction permits in ZIP 60645 has 40 issued records, a 50 days median, and a 193 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 6064550 days193 days40
ZIP 6063850 days135 days38
ZIP 6061648 days128 days190
ZIP 6064648 days146 days42
ZIP 6063252 days120 days122
ZIP 6062452 days101 days162
ZIP 6065552 days103 days38
ZIP 6061552 days85 days154