ZIP code × permit type
New Construction permits in ZIP 60631
The median new construction permit wait in ZIP 60631 was 38 days, based on 77 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For New Construction permits in ZIP 60631, 77 issued permit records show a median processing time of 38 days; 75% were issued within 95 days and 90% within 142 days, covering January 2021 through September 15, 2026.
Not enough records for a year-over-year comparison.
New Construction permits in ZIP 60631: wait distribution
For New Construction permits in ZIP 60631, 77 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
New Construction permits in ZIP 60631: annual permit timing
New Construction permits in ZIP 60631 has 6 publishable issue-year cohorts spanning 2021–2026, representing 77 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 14 | 0.5 days | 14 days | 30 days |
| 2022 | 17 | 38 days | 73 days | 136 days |
| 2023 | 12 | 48 days | 142 days | 216 days |
| 2024 | 11 | 101 days | 113 days | 144 days |
| 2025 | 13 | 78 days | 85 days | 117 days |
| 2026* | 10 | 48 days | 110 days | 146 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
New Construction permits in ZIP 60631: New Construction timing in comparable ZIP codes
New Construction permits in ZIP 60631 has 77 issued records, a 38 days median, and a 95 days 75th-percentile wait in this release.
More New Construction permits in ZIP 60631 comparisons
The New Construction permits in ZIP 60631 cohort contains 77 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60631 permits ZIP reportNew Construction citywide Type report