Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

Elevator Equipment permits in ZIP 60610

The median elevator equipment permit wait in ZIP 60610 was 0 days, based on 208 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked2082021–Sep. 15, 2026

The short answer

For Elevator Equipment permits in ZIP 60610, 208 issued permit records show a median processing time of 0 days; 75% were issued within 0 days and 90% within 7 days, covering January 2021 through September 15, 2026.

Typical wait0 daysmedian issued permit
Usually within0 days75% of records
Long-wait edge7 days90% of records
Evidence208issued permits

The median was unchanged from the previous 12 months.

Elevator Equipment permits in ZIP 60610: wait distribution

For Elevator Equipment permits in ZIP 60610, 208 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
77.4%
1–7 days
16.3%
8–30 days
5.3%
31–90 days
1.0%
91+ days
0.0%

Change over time

Elevator Equipment permits in ZIP 60610: annual permit timing

Elevator Equipment permits in ZIP 60610 has 6 publishable issue-year cohorts spanning 2021–2026, representing 208 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
2021410 days5 days14 days
2022400 days0 days5 days
2023420 days0 days7 days
2024300 days0 days5.1 days
2025340 days1.5 days7 days
2026*210 days0 days5 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Elevator Equipment permits in ZIP 60610: Elevator Equipment timing in comparable ZIP codes

Elevator Equipment permits in ZIP 60610 has 208 issued records, a 0 days median, and a 0 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 606010 days5 days290
ZIP 606020 days5 days113
ZIP 606030 days5 days147
ZIP 606040 days0 days90
ZIP 606050 days4 days187
ZIP 606060 days5 days240
ZIP 606070 days1 day240
ZIP 606080 days0 days146