Independent analysis of City of Chicago recordsData through Sep. 15, 2026

Official community area

Near West Side permit processing times

For 10,466 issued permits in Near West Side, the median processing time was 2 days; 75% were issued within 21 days.

Records checked10,4662021–Sep. 15, 2026

The short answer

Typical wait2 daysmedian issued permit
Usually within21 days75% of records
Long-wait edge74 days90% of records
Evidence10,466issued permits

The median was 1 day faster than the previous 12 months.

How the waits are distributed

Median is only the middle. This shows how often issued permits fell into each elapsed-time band.

Same day
41.1%
1–7 days
20.7%
8–30 days
18.3%
31–90 days
12.0%
91+ days
7.9%

Change over time

Annual permit timing

Issue yearRecordsMedian75th percentile90th percentile
20211,9990 days14 days67 days
20222,1410 days14 days59 days
20232,0081 day20 days71 days
20241,6288 days32 days82 days
20251,5446 days24 days82 days
2026*1,1466 days28 days90 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Nearby points in the citywide timing distribution

ReportMedian75% withinRecords
Avondale2 days21 days2,361
Bridgeport2 days24 days1,920
Brighton Park2 days19 days1,507
Englewood2 days24 days2,131
Lake View2 days23 days6,844
Logan Square2 days29 days5,067
Loop2 days15 days15,467
Lower West Side2 days31 days2,358