Lower West Side permit processing times
For 2,358 issued permits in Lower West Side, the median processing time was 2 days; 75% were issued within 31 days.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Lower West Side permit processing times, 2,358 issued permit records show a median processing time of 2 days; 75% were issued within 31 days and 90% within 116 days, covering January 2021 through September 15, 2026.
The median was 1 day faster than the previous 12 months.
Lower West Side permit processing times: wait distribution
For Lower West Side permit processing times, 2,358 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Lower West Side permit processing times: annual permit timing
Lower West Side permit processing times has 6 publishable issue-year cohorts spanning 2021–2026, representing 2,358 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 462 | 0 days | 12 days | 81 days |
| 2022 | 470 | 0 days | 18 days | 92 days |
| 2023 | 361 | 0 days | 19 days | 130 days |
| 2024 | 428 | 9 days | 52 days | 149 days |
| 2025 | 359 | 7 days | 44 days | 147 days |
| 2026* | 278 | 9 days | 42 days | 110 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Lower West Side permit processing times: Nearby points in the citywide timing distribution
Lower West Side permit processing times has 2,358 issued records, a 2 days median, and a 31 days 75th-percentile wait in this release.
| Report | Median | 75% within | Records |
|---|---|---|---|
| Avondale | 2 days | 21 days | 2,361 |
| Bridgeport | 2 days | 24 days | 1,920 |
| Brighton Park | 2 days | 19 days | 1,507 |
| Englewood | 2 days | 24 days | 2,131 |
| Lake View | 2 days | 23 days | 6,844 |
| Logan Square | 2 days | 29 days | 5,067 |
| Loop | 2 days | 15 days | 15,467 |
| Lower West Side | 2 days | 31 days | 2,358 |
More Lower West Side permit processing times comparisons
The Lower West Side permit processing times cohort contains 2,358 issued records; related links retain separate location and permit-category cohorts.
Express Permit Program 1 dayRenovation & Alteration 48 daysEasy Permit Process 0 daysNew Construction 43 daysSigns 33 daysWrecking & Demolition 0 daysElevator Equipment 0 daysReinstated Permit 0 days