Community area × permit type
Signs permits in Dunning
The typical signs permit issued in Dunning took 10 days. The 75th-percentile wait was 36 days.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Signs permits in Dunning, 72 issued permit records show a median processing time of 10 days; 75% were issued within 36 days and 90% within 95 days, covering January 2021 through September 15, 2026.
Not enough records for a year-over-year comparison.
Signs permits in Dunning: wait distribution
For Signs permits in Dunning, 72 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Signs permits in Dunning: annual permit timing
Signs permits in Dunning has 2 publishable issue-year cohorts spanning 2022–2024, representing 47 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2022 | 34 | 4.5 days | 7.8 days | 16 days |
| 2024 | 13 | 41 days | 42 days | 86 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Signs permits in Dunning: Signs timing in comparable community areas
Signs permits in Dunning has 72 issued records, a 10 days median, and a 36 days 75th-percentile wait in this release.
| Report | Median | 75% within | Records |
|---|---|---|---|
| Dunning | 10 days | 36 days | 72 |
| Beverly | 11 days | 27 days | 72 |
| Garfield Ridge | 10 days | 21 days | 242 |
| Ohare | 10 days | 19 days | 111 |
| Mckinley Park | 9 days | 22 days | 124 |
| Norwood Park | 9 days | 26 days | 134 |
| Douglas | 8.5 days | 24 days | 48 |
| Archer Heights | 13 days | 28 days | 115 |
More Signs permits in Dunning comparisons
The Signs permits in Dunning cohort contains 72 issued records; related links retain separate location and permit-category cohorts.
All Dunning permits Area reportSigns citywide Type report