Independent analysis of City of Chicago recordsData through Sep. 15, 2026

ZIP code × permit type

Scaffolding permits in ZIP 60660

The median scaffolding permit wait in ZIP 60660 was 0 days, based on 30 issued records.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked302021–Sep. 15, 2026

The short answer

For Scaffolding permits in ZIP 60660, 30 issued permit records show a median processing time of 0 days; 75% were issued within 0 days and 90% within 0.1 days, covering January 2021 through September 15, 2026.

Typical wait0 daysmedian issued permit
Usually within0 days75% of records
Long-wait edge0.1 days90% of records
Evidence30issued permits

Not enough records for a year-over-year comparison.

Scaffolding permits in ZIP 60660: wait distribution

For Scaffolding permits in ZIP 60660, 30 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
90.0%
1–7 days
10.0%
8–30 days
0.0%
31–90 days
0.0%
91+ days
0.0%

Change over time

Scaffolding permits in ZIP 60660: annual permit timing

Scaffolding permits in ZIP 60660 has 2 publishable issue-year cohorts spanning 2022–2023, representing 23 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
2022130 days0 days0.8 days
2023100 days0 days0 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Scaffolding permits in ZIP 60660: Scaffolding timing in comparable ZIP codes

Scaffolding permits in ZIP 60660 has 30 issued records, a 0 days median, and a 0 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
ZIP 606010 days0 days51
ZIP 606020 days0 days27
ZIP 606030 days1 day35
ZIP 606040 days0.2 days32
ZIP 606050 days0 days84
ZIP 606060 days0 days55
ZIP 606070 days0 days26
ZIP 606100 days0 days108