Scaffolding permits in ZIP 60604
The median scaffolding permit wait in ZIP 60604 was 0 days, based on 32 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Scaffolding permits in ZIP 60604, 32 issued permit records show a median processing time of 0 days; 75% were issued within 0.2 days and 90% within 2 days, covering January 2021 through September 15, 2026.
Not enough records for a year-over-year comparison.
Scaffolding permits in ZIP 60604: wait distribution
For Scaffolding permits in ZIP 60604, 32 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Scaffolding permits in ZIP 60604: annual permit timing
Scaffolding permits in ZIP 60604 has 2 publishable issue-year cohorts spanning 2022–2023, representing 23 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2022 | 11 | 0 days | 0.5 days | 2 days |
| 2023 | 12 | 0 days | 1 day | 1.9 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Scaffolding permits in ZIP 60604: Scaffolding timing in comparable ZIP codes
Scaffolding permits in ZIP 60604 has 32 issued records, a 0 days median, and a 0.2 days 75th-percentile wait in this release.
More Scaffolding permits in ZIP 60604 comparisons
The Scaffolding permits in ZIP 60604 cohort contains 32 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60604 permits ZIP reportScaffolding citywide Type report