ZIP code × permit type
Scaffolding permits in ZIP 60616
The median scaffolding permit wait in ZIP 60616 was 0 days, based on 31 issued records.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Scaffolding permits in ZIP 60616, 31 issued permit records show a median processing time of 0 days; 75% were issued within 0 days and 90% within 0 days, covering January 2021 through September 15, 2026.
Not enough records for a year-over-year comparison.
Scaffolding permits in ZIP 60616: wait distribution
For Scaffolding permits in ZIP 60616, 31 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Scaffolding permits in ZIP 60616: annual permit timing
Scaffolding permits in ZIP 60616 has 2 publishable issue-year cohorts spanning 2021–2023, representing 26 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2021 | 15 | 0 days | 0 days | 0.6 days |
| 2023 | 11 | 0 days | 0 days | 0 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Scaffolding permits in ZIP 60616: Scaffolding timing in comparable ZIP codes
Scaffolding permits in ZIP 60616 has 31 issued records, a 0 days median, and a 0 days 75th-percentile wait in this release.
More Scaffolding permits in ZIP 60616 comparisons
The Scaffolding permits in ZIP 60616 cohort contains 31 issued records; related links retain separate location and permit-category cohorts.
All ZIP 60616 permits ZIP reportScaffolding citywide Type report