Elevator Equipment permits in South Shore

The typical elevator equipment permit issued in South Shore took 0 days. The 75th-percentile wait was 0 days.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked1002021–Sep. 15, 2026

The short answer

For Elevator Equipment permits in South Shore, 100 issued permit records show a median processing time of 0 days; 75% were issued within 0 days and 90% within 2 days, covering January 2021 through September 15, 2026.

Typical wait0 daysmedian issued permit
Usually within0 days75% of records
Long-wait edge2 days90% of records
Evidence100issued permits

Not enough records for a year-over-year comparison.

Elevator Equipment permits in South Shore: wait distribution

For Elevator Equipment permits in South Shore, 100 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
89.0%
1–7 days
9.0%
8–30 days
2.0%
31–90 days
0.0%
91+ days
0.0%

Change over time

Elevator Equipment permits in South Shore: annual permit timing

Elevator Equipment permits in South Shore has 5 publishable issue-year cohorts spanning 2021–2025, representing 95 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
2021130 days0 days0 days
2022240 days0 days0 days
2023230 days0 days1.6 days
2024220 days0 days0 days
2025130 days0 days6.6 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Elevator Equipment permits in South Shore: Elevator Equipment timing in comparable community areas

Elevator Equipment permits in South Shore has 100 issued records, a 0 days median, and a 0 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
Armour Square0 days0 days35
Ashburn0 days0 days32
Auburn Gresham0 days0 days64
Austin0 days0 days126
Avondale0 days0 days29
Belmont Cragin0 days0 days47
Beverly0 days0 days33
Bridgeport0 days0 days45