Community area × permit type
Elevator Equipment permits in Grand Boulevard
The typical elevator equipment permit issued in Grand Boulevard took 0 days. The 75th-percentile wait was 0 days.
Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026
The short answer
For Elevator Equipment permits in Grand Boulevard, 44 issued permit records show a median processing time of 0 days; 75% were issued within 0 days and 90% within 4.1 days, covering January 2021 through September 15, 2026.
Not enough records for a year-over-year comparison.
Elevator Equipment permits in Grand Boulevard: wait distribution
For Elevator Equipment permits in Grand Boulevard, 44 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.
Change over time
Elevator Equipment permits in Grand Boulevard: annual permit timing
Elevator Equipment permits in Grand Boulevard has 2 publishable issue-year cohorts spanning 2022–2024, representing 23 issued records in the annual table.
| Issue year | Records | Median | 75th percentile | 90th percentile |
|---|---|---|---|---|
| 2022 | 12 | 0 days | 0 days | 0 days |
| 2024 | 11 | 0 days | 1 day | 5 days |
*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.
Context
Elevator Equipment permits in Grand Boulevard: Elevator Equipment timing in comparable community areas
Elevator Equipment permits in Grand Boulevard has 44 issued records, a 0 days median, and a 0 days 75th-percentile wait in this release.
| Report | Median | 75% within | Records |
|---|---|---|---|
| Armour Square | 0 days | 0 days | 35 |
| Ashburn | 0 days | 0 days | 32 |
| Auburn Gresham | 0 days | 0 days | 64 |
| Austin | 0 days | 0 days | 126 |
| Avondale | 0 days | 0 days | 29 |
| Belmont Cragin | 0 days | 0 days | 47 |
| Beverly | 0 days | 0 days | 33 |
| Bridgeport | 0 days | 0 days | 45 |
More Elevator Equipment permits in Grand Boulevard comparisons
The Elevator Equipment permits in Grand Boulevard cohort contains 44 issued records; related links retain separate location and permit-category cohorts.
All Grand Boulevard permits Area reportElevator Equipment citywide Type report