Independent analysis of City of Chicago recordsData through Sep. 15, 2026

Community area × permit type

Elevator Equipment permits in Near South Side

The typical elevator equipment permit issued in Near South Side took 0 days. The 75th-percentile wait was 0 days.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked1132021–Sep. 15, 2026

The short answer

For Elevator Equipment permits in Near South Side, 113 issued permit records show a median processing time of 0 days; 75% were issued within 0 days and 90% within 5 days, covering January 2021 through September 15, 2026.

Typical wait0 daysmedian issued permit
Usually within0 days75% of records
Long-wait edge5 days90% of records
Evidence113issued permits

Not enough records for a year-over-year comparison.

Elevator Equipment permits in Near South Side: wait distribution

For Elevator Equipment permits in Near South Side, 113 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
81.4%
1–7 days
15.0%
8–30 days
3.5%
31–90 days
0.0%
91+ days
0.0%

Change over time

Elevator Equipment permits in Near South Side: annual permit timing

Elevator Equipment permits in Near South Side has 6 publishable issue-year cohorts spanning 2021–2026, representing 113 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
2021250 days0 days0.6 days
2022200 days1.2 days7 days
2023130 days0 days0 days
2024190 days3.5 days5 days
2025150 days0 days0 days
2026*210 days0 days9 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Elevator Equipment permits in Near South Side: Elevator Equipment timing in comparable community areas

Elevator Equipment permits in Near South Side has 113 issued records, a 0 days median, and a 0 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
Armour Square0 days0 days35
Ashburn0 days0 days32
Auburn Gresham0 days0 days64
Austin0 days0 days126
Avondale0 days0 days29
Belmont Cragin0 days0 days47
Beverly0 days0 days33
Bridgeport0 days0 days45