Independent analysis of City of Chicago recordsData through Sep. 15, 2026

Community area × permit type

Elevator Equipment permits in Englewood

The typical elevator equipment permit issued in Englewood took 0 days. The 75th-percentile wait was 0 days.

Source: City of Chicago Building Permits · Issued-permit cohort · Updated Sep. 16, 2026

Records checked522021–Sep. 15, 2026

The short answer

For Elevator Equipment permits in Englewood, 52 issued permit records show a median processing time of 0 days; 75% were issued within 0 days and 90% within 0.9 days, covering January 2021 through September 15, 2026.

Typical wait0 daysmedian issued permit
Usually within0 days75% of records
Long-wait edge0.9 days90% of records
Evidence52issued permits

Not enough records for a year-over-year comparison.

Elevator Equipment permits in Englewood: wait distribution

For Elevator Equipment permits in Englewood, 52 issued permits are distributed across five elapsed-time bands from same-day issuance through waits of 91 days or longer.

Same day
88.5%
1–7 days
11.5%
8–30 days
0.0%
31–90 days
0.0%
91+ days
0.0%

Change over time

Elevator Equipment permits in Englewood: annual permit timing

Elevator Equipment permits in Englewood has 1 publishable issue-year cohorts spanning 2024–2024, representing 16 issued records in the annual table.

Issue yearRecordsMedian75th percentile90th percentile
2024160 days0 days3.5 days

*2026 is partial through Sep. 15. Year labels use the permit issue date, not the application date.

Context

Elevator Equipment permits in Englewood: Elevator Equipment timing in comparable community areas

Elevator Equipment permits in Englewood has 52 issued records, a 0 days median, and a 0 days 75th-percentile wait in this release.

ReportMedian75% withinRecords
Armour Square0 days0 days35
Ashburn0 days0 days32
Auburn Gresham0 days0 days64
Austin0 days0 days126
Avondale0 days0 days29
Belmont Cragin0 days0 days47
Beverly0 days0 days33
Bridgeport0 days0 days45